Monday, May 14, 2012

The first Windows 8 shelves in November.

,
The first Windows 8 shelves in November.
The first bars of an Intel processor and equipped with Windows 8 should be launched on the market in the month of November. This is in any case what some sources close to the manufacturers of shelves are. More than a dozen models would be provided in a first time, half of the hybrid models, i.e. Convertible laptop computers touch tablets. All models of this first wave of Windows 8 tablets would work with a chip Atom Clover Trail, a dual-core model engraved in 32 nm that Intel will launch on this occasion. Of other Windows 8 tablet equipped with a processor Ivy Bridge should eventually see the day, but their characteristics are not yet known. Finally, Intel is already working on Bay Trail; the successor of Clover Trail engraved 22 nm. Course, once available, this future processor will naturally find its place in the market of Windows 8 tablets.

0 comments to “The first Windows 8 shelves in November.”

Post a Comment

 

Technology Trend Copyright © 2011 | Template design by O Pregador | Powered by Blogger Templates